What the job actually involves
Replacing a consumer unit is not a swap. Before the old board comes off the wall the electrician has to establish that the existing installation is safe to reconnect to a new one, because the moment the new board goes on, they are certifying it.
- Pre-work testing — insulation resistance and continuity on every circuit, to confirm nothing will trip out the new RCDs the second the power goes back on.
- Checking the earthing arrangement and main bonding — gas and water bonding to current sizes, and the main earthing conductor. This is where most of the unexpected extra cost lives.
- Isolation — the supply is off while the work happens, typically for a couple of hours in the middle of the day.
- Fitting the new board — mounting, terminating every circuit, labelling, and fitting any surge protection.
- Full testing and certification — dead and live tests on every circuit, an Electrical Installation Certificate, a circuit chart on the board, and notification under Part P.
Total Skills puts the job at four to eight hours with the power off for two to four of them (last reviewed August 2026, checked 6 September 2026). MyJobQuote gives the same four-to-eight-hour window (last updated 4 August 2026, checked 6 September 2026). It is a day, in other words — which is why quotes that look like a couple of hours of labour should be questioned.
What drives the price
- Number of circuits. More circuits means a bigger board, more devices and more testing. This is the main driver.
- Board type. A dual RCD split-load board is cheaper; a full RCBO board costs more but means one fault takes out one circuit rather than half the house. Most electricians now recommend RCBOs, and the price difference is worth it.
- Pre-existing faults. If insulation resistance testing finds a borrowed neutral or a damp circuit, that has to be fixed before the new board goes on. It cannot be left.
- Earthing and bonding. Undersized or missing main bonding to gas and water is extremely common in older houses and is not optional.
- Meter tails and the position of the cut-out. Old or undersized tails need upgrading; some jobs need the supplier to attend.
- Where the board is. A board in an understairs cupboard behind fifteen years of stored coats takes longer than one at chest height in a hallway.
- Region. MyJobQuote puts a typical London job at £675 against £500 in the North West or North East (last updated 4 August 2026).